Skip to content
Search
lg@lugsicher.com+86 21 5666 0068 Mobile +86 199 4601 0778
Menu

Installation and production

Laser Marking Failure Review: Seven Records to Keep

Capture the conditions around a failed mark so production and engineering can reproduce the issue and verify a correction.

1–3. Symptom, material and recipe

Keep the original images and specify the failed criterion. Capture material and lot, surface and condition. Record hardware, optics, parameter set, template and version.

Lugsicher LUG300 industrial fume extraction unit
Lugsicher LUG300 industrial fume extraction unit

4–5. Position and timing

Record the part pose and height, focal distance, field position, transport speed, pitch, trigger and encoder feedback. Compare the failure with recent good production.

6. Data and interfaces

Keep the order, code data, unit identity, PLC events, inspection results and disposition when available. Verify that all evidence refers to the same item.

7. Maintenance and repeat trial

Record cleaning, alignment, interventions and the exact change tested. Separate confirmed causes from hypotheses and document the conditions under which the correction was reproduced.

Discuss your application

Share your material, mark file and line conditions so we can review sample testing and integration.

Send an application enquiry