Installation and production
Laser Marking Failure Review: Seven Records to Keep
Capture the conditions around a failed mark so production and engineering can reproduce the issue and verify a correction.
1–3. Symptom, material and recipe
Keep the original images and specify the failed criterion. Capture material and lot, surface and condition. Record hardware, optics, parameter set, template and version.

4–5. Position and timing
Record the part pose and height, focal distance, field position, transport speed, pitch, trigger and encoder feedback. Compare the failure with recent good production.
6. Data and interfaces
Keep the order, code data, unit identity, PLC events, inspection results and disposition when available. Verify that all evidence refers to the same item.
7. Maintenance and repeat trial
Record cleaning, alignment, interventions and the exact change tested. Separate confirmed causes from hypotheses and document the conditions under which the correction was reproduced.
Discuss your application
Share your material, mark file and line conditions so we can review sample testing and integration.
Send an application enquiry
INDUSTRIAL


