Data and line integration
Readable Code, False Reject: Five Checks on the Line
Reconstruct the exact inspection cycle to separate image quality, timing, item tracking, business validation and physical rejection.
1. Review the original frame
Inspect the image captured at the decision, including glare, blur, field position and contrast. A later stationary reread uses different conditions.
2. Check when the result arrived
Compare trigger, image, decision and PLC timestamps with the available response window.
3. Verify product association
Follow the image and result to the item that reached the reject point. Test missing units, changing pitch and the result queue after restart.
4. Read the reason for rejection
Separate decoding failure from wrong content, a duplicate, an incorrect template or a failed business rule.
5. Confirm the physical action
Compare the commanded reject, feedback and actual rejected sample. Record the event identifiers and timing before changing thresholds.
Discuss your application
Share your material, mark file and line conditions so we can review sample testing and integration.
Send an application enquiry
INDUSTRIAL


