Skip to content
Search
lg@lugsicher.com+86 21 5666 0068 Mobile +86 199 4601 0778
Menu

Data and line integration

Integrating Labeling, Vision and Traceability Across Plants

Assign ownership of label data, printing, verification and disposition before rolling out the same labeling workflow to several sites.

Separate printing, print-exit inspection and post-application inspection

Print-exit inspection checks whether the characters or codes on the printed label are correct and readable. A downstream inspection can check that the correct label is present, legible and positioned on the right product after application.

Carry one identity through the process

Define the order, label template, identifier and expected data. Connect the print request, product trigger, inspection result and confirmed disposition to the same item. Test retries, changeovers and rework.

Standardize rules that can travel

Use shared label specifications, interface meanings, acceptance methods, data ownership and change control. At each plant, verify material, transport, lighting, cycle time, rejection and service conditions.

Pilot before replicating

At the first line, test correct and wrong labels, unreadable codes, a missing item, rejected-unit confirmation and log reconciliation. Use the results to define the baseline and the site-by-site checks.

Discuss your application

Share your material, mark file and line conditions so we can review sample testing and integration.

Send an application enquiry