Data and line integration
Serialization Interfaces: Orders, Status and Confirmation
Specify who owns orders, templates, code allocation, line status, inspection results and physical disposition in a serialization workflow.
Assign the sources of truth
Identify who issues the job and serial data, approves the template, marks the part, performs inspection, controls the reject and keeps the manufacturing record.
Name the states the line must distinguish
Separate received, accepted for execution, completed marking, inspection pass or fail, and confirmed physical disposition. Define correlation fields such as order, unit identifier, station and event time.
Specify timeouts, retries and recovery
Distinguish duplicate delivery from a new request. Define acknowledgment, repeat-safe processing, what to do after connection loss, and how to reconcile equipment and MES records before resuming.
Test with line events as well as messages
Include missed triggers, wrong templates, aborted marking, rejected parts, hold or rework and interrupted jobs. Confirm each record can be matched to the correct physical item.
Discuss your application
Share your material, mark file and line conditions so we can review sample testing and integration.
Send an application enquiry
INDUSTRIAL


